Levee Underseepage Control Improvement (Geotechnical MR_2)

  • LOCATION:Avenue G
  • YEAR COMPLETED:Underway
  • KEY FEATURES:Relief Well Modification

The project modified the existing relief well system by retrofitting the system with a buried discharge pipe system to collect flow from the relief wells. A groundwater sump was constructed to collect and allow form pumping of flow collected from the relief wells.

Previous Next
Other Levee Improvement Projects

Levee Underseepage Control Improvement (Geotechnical MR_7)

Geotechnical

Levee Railroad Flood Gate Closure Rehabilitation (Structural MR_1)

Structural

Levee Structural Improvement and Encroachment Removal (Structural MR_2)

Structural