Levee Underseepage Control Improvement (Geotechnical MR_7)

  • LOCATION:Western Historic Trails Center
  • YEAR COMPLETED:Underway
  • KEY FEATURES:Sand Berm Installation, Relief Well Replacement

The project replaced existing levee underseepage control features. Seven new relief wells were installed to replace seven original relief wells. A stability and seepage sand berm was installed to supplement the relief wells. The sand berm was constructed utilizing existing sand berm material on-site placed during the 2011 flood.