Levee Railroad Flood Gate Closure Rehabilitation (Structural MR_1)

  • LOCATION:Union Pacific Railroad by Nebraska Avenue
  • YEAR COMPLETED:Underway
  • KEY FEATURES:Sill Repair, Mechanical Feature Replacement, Repainting

The project rehabilitated the existing Union Pacific Railroad flood gate closure. New mechanical features were installed and the flood gate was repainted. The damaged sill of the closure was repaired.

Previous Next
Other Levee Improvement Projects

Levee Structural Improvement and Encroachment Removal (Structural MR_2)

Structural

Levee Underseepage Control Improvement (Geotechnical MR_1)

Geotechnical

Levee Underseepage Control Improvement (Geotechnical MR_2)

Geotechnical