LOCATION:
Avenue G
YEAR COMPLETED:
2018
KEY FEATURES:
Relief Well Modification
ABOUT THE PROJECT:
The project modified the existing relief well system by retrofitting the system with a buried discharge pipe system to collect flow from the relief wells. A groundwater sump was constructed to collect and allow for pumping of flow collected from the relief wells.