LOCATION:

Western Historic Trails Center

YEAR COMPLETED:

2018

KEY FEATURES:

Sand Berm Installation, Relief Well Replacement

ABOUT THE PROJECT:

The project replaced existing levee underseepage control features. Seven new relief wells were installed to replace seven original relief wells. A stability and seepage sand berm was installed to supplement the relief wells. The sand berm was constructed utilizing existing sand berm material on-site placed during the 2011 flood.