LOCATION:

I-29 Exit 54-A

YEAR COMPLETED:

2016

KEY FEATURES:

Floodwall Removal, Levee Embankment Installation, Encroachment Removal

ABOUT THE PROJECT:

The project removed an aged floodwall and replaced with earthen levee embankment. The project also removed old water infrastructure that was encroaching the levee system.